Sign In | Join Free | My xuijs.com
China Chengdu Forster Technology Co., Ltd. logo
Chengdu Forster Technology Co., Ltd.
Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.
Active Member

6 Years

Home > Pelton Turbine Generator >

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

Chengdu Forster Technology Co., Ltd.
Contact Now

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

  • 1
  • 2

Brand Name : Forster

Model Number : CJA237/475-W-115

Certification : CE/TUV/ISO9001/From-E

Place of Origin : Sichuan, China (Mainland)

MOQ : 1 Set/Sets

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 50 Set/Sets per Month

Delivery Time : 120days

Packaging Details : Wood box

Rated power : 100kw-3mw

Voltage : 380v/400v/3.5kv/6.3kv/10kv/20kv/35kv

Frequency : 50Hz/60Hz

Generator type : 3 Phase AC

Insulation class : F/F

Governor : High Hydraulic Microcomputer Governor

Efficiency : 87.5-98%

Rated speed : 500-1000rpm/min

Keyword : hydroelectric pelton turbine generator

Port : SHANGHAI,SHENZHEN

Contact Now

High Efficiency High Head Double Nozzle And Multi-Nozzle Hydro Pelton Turbine Generator For HPP

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

The impact turbine can be divided into two types according to the flow direction of the water flow (also known as the water bucket type) and the oblique type. The structure of the slanting turbine is basically the same as that of the puddle turbine, except that the direction of the jet has an inclination angle and is used only for small units.


Theoretical analysis proves that the efficiency is highest when the circumferential velocity at the pitch circle is about half of the jet velocity. When the load changes, the direction of the water inlet speed of the runner is constant. In addition, the turbines are used in the high-head power station. The head change is relatively small and the speed changes little, so the efficiency is less affected by the load change. The efficiency curve is relatively flat and the highest efficiency is over 91%.


A hydraulic turbine is a power machine that converts the energy of a water stream into a rotating mechanical energy. It is a turbomachinery in fluid machinery. As early as around 100 BC, China emerged as the prototype of the turbine, the water wheel, used to pump and drive food processing equipment. Most modern hydro turbines are installed in hydropower stations to drive generators to generate electricity. In the hydropower station, the water in the upstream reservoir is led to the turbine through the water conduit, pushing the turbine runner to rotate and driving the generator to generate electricity. The finished water is drained downstream through the tailpipe. The higher the head and the greater the flow, the greater the output power of the turbine.

1. suitable for high head,small flow and flow changes in large runoff hydropower station.

2. With the power plant investment is small,compact units structure characteristics.

3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4. Suitable for high head,small flow station in mountainous area.

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:
Pelton tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA475-W-125/2x14 137 1.541 1739 375 SFW1600-16/2600 1600 CJWT- II BWT-6000 DN800
157 1.662 2151 SFW2000-16/2600 2000
183 1.783 2688 428.6 SFW2500-14/2600 2500
214 1.941 3422 SFW3200-14/2600 3200
248 2.082 4255 500 SFW4000-12/2600 4000 CJWT- II BWT-10000
287 2.237 5291 SFW5000-12/2600 5000
CJA475-W-140/2x14 116 1.429 1366 300 SFW1250-20/2600 1250 CJWT- II BWT-6000 DN800
137 1.541 1739 333.3 SFW1600-18/2600 SFW2000-18/2600 1600
157 1.662 2151 2000
183 1.783 2688 375 SFW2500-16/2600 2500
214 1.941 3422 428.6 SFW3200-14/2600 3200
248 2.082 4255 SFW4000-14/2600 4000 CJWT- II BWT-10000
287 2.237 5291 500 SFW5000-12/2600 5000
333 2.417 6632 SFW6300-12/2600 6300
400 2.495 8421 600 SFW8000-10/2600 8000
CJA475-W-140 /2x16 114 1.851 1739 300 SFW1600-20/2600 1600 CJWT- II BWT-6000
132 1.977 2151 SFW2000-20/2600 2000
153 2.132 2688 333.3 SFW2500-18/2600 2500
179 2.32 3422 375 SFW3200-16/2600 3200 CJWT- II BWT-10000 DN 1000
207 2.495 4255 SFW4000-16/2600 4000
240 2.675 5291 428.6 SFW5000-14/2600 5000
279 2.884 6632 500 SFW6300-12/2600 6300

Product pictures:

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min SpeedHigh Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

Installation picture:

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, How many an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com


Product Tags:

pelton wheel hydro generator

      

pelton water turbine generator

      
Best High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed wholesale

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0